Gallery Roof Co

Metal re-roofs · Brisbane

Metal re-roofing in Brisbane.

Old sheets off, frame checked, new 40mm top hat battens, R1.3 Anti-Con blanket, Colorbond in the profile the roof needs, and new flashings throughout. A typical house is two days on site, with a 10-year workmanship warranty.

Step 1 of 4 · Job

What does the roof need?

Tick as many as apply.

FREE INSPECTION · QUOTE WITHIN 2 DAYS

40mm
top hat battens
R1.3
Anti-Con blanket
Class 4
cyclone-rated screws
  • 40+ yrs
    combined experience
  • 10 yr
    workmanship warranty
  • 25 yr
    Colorbond material warranty
  • QBCC 15609463
    licensed and insured
  • Master Builders
    member
  • Colorbond
    accredited
01

Included

What is included on every re-roof

  1. 01

    Ridge capping and wall flashings done properly

    Cut, folded and fixed to the profile. Never siliconed. This is the thing the team would put on the front of the business.

  2. 02

    New 40mm top hat battens

    Or whatever the engineer has specified. We never screw new sheets into old battens.

  3. 03

    R1.3 Anti-Con blanket and sisalation

    Under every sheet. It is part of the roof, not an upgrade line on the quote.

  4. 04

    Colorbond, any profile

    Corrugated, Trimdek and the rest, fixed with Class 4 cyclone-rated screws to the manufacturer's specification for the area.

  5. 05

    New flashings, gutters and downpipes

    Nothing from the old roof is reused. Box gutters are laid with fall and fitted with overflows.

  6. 06

    Frame checked, site cleared, every stage photographed

    Tie-down upgrades added if necessary before sheets go on. Tie-down, battens and finishes photographed with overview shots and sent to you. Magnet sweep for screws before we leave.

Roof frame with new steel battens fixed, ready for sheets
FIG. 02New battens before sheeting
Grey Trimdek hip roof with new ridge capping
FIG. 03Trimdek re-roof, finished
04

Process

How a re-roof runs, from work order to clean-up

Seven steps, because that is how many there are. A typical house is 2 days on site.

  1. 01

    Work order or inspection

    For insurance work, the work order comes from the insurance builder. For everything else, a free inspection and a fixed-price quote back within two days.

  2. 02

    Material take-off

    Sheets, battens, blanket, flashings and gutters measured off the roof and ordered. Colorbond, in the profile the job calls for.

  3. 03

    Delivery and edge protection booked

    You are told when the materials land and when our own edge protection goes up. No third-party scaffold company to chase.

  4. 04

    Time frame and variations agreed

    The start date, usually within four weeks, and any variation that would give a better build, raised before the job starts rather than mid-way through.

  5. 05

    The build

    Old roof off, frame checked and tie-down upgrades added if necessary, new battens, blanket and sarking, sheets, flashings, gutters. A typical house takes two days.

  6. 06

    Photographed at every stage

    Tie-down, batten work and every finish photographed, with multiple overview shots, and sent to you. What is under the sheets is on record.

  7. 07

    Edge protection down, site cleared

    All scrap and debris removed, magnet sweep for screws, and your property returned to how it was, with a new roof on it.

06

Customers

What builders and homeowners say

SWIPE →

  • “They replaced our roof after hail damage and went above and beyond.”

    David Fell · Google review · Hail re-roof
  • “Prompt service and always quality installations on all my extensions.”

    Dave Jesson · Builder · Extensions
  • “I've worked with Gallery Roof Co since their start and they have nailed every build sent their way, no call backs and every client satisfied.”

    Dale · Builder · New builds
  • “All the build was handled by Gallery Roof Co. As soon as the job was finished my property returned to the exact state it was prior, just with a brand new roof.”

    Craig · Homeowner · Re-roof
Read our Google reviews

Also

Where we do this work

Across Brisbane from Woolloongabba. Recent jobs in Manly West, Capalaba, Camp Hill, Kelvin Grove, Wynnum, Lota.

08

FAQ

Roofing questions, answered

What goes under the new sheets?

+

New 40mm top hat battens (or whatever the engineer specifies), R1.3 Anti-Con blanket and sisalation paper, then Colorbond in the profile the roof calls for, fixed with Class 4 cyclone-rated screws to the manufacturer's specification. New flashings everywhere. None of that is an optional extra.

How long does a re-roof take?

+

A typical house is two days on site. From a signed quote we usually start within four weeks, and the quote itself comes back within two days of the inspection.

Do I need to be home, or supply anything?

+

Only electricity, and if the site has none the work cars carry solar power stations. You are told when materials are delivered and when edge protection goes up, and every stage is photographed and sent to you.

Do you work on tile roofs?

+

We replace them. Tile to metal conversions are a regular job for us: tiles and old battens off, frame checked, new battens and blanket, Colorbond on. We do not restore, repaint or re-lay tile roofs.

What warranty do you give?

+

A ten-year workmanship warranty from Gallery Roof Co, on top of the 25-year Colorbond material warranty. We are QBCC licensed (15609463), insured, Master Builders members and Colorbond accredited.

Next step

Get a fixed-price re-roof quote

Fill in the form or call us on 0428 699 684. Inspection is free, the quote is back within 2 days, and the price on it is the price you pay.

Call 0428 699 684
2 days
quote back
4 weeks
to start
2 days
on site

Step 1 of 4 · Job

What does the roof need?

Tick as many as apply.

FREE INSPECTION · QUOTE WITHIN 2 DAYS

Call 0428 699 684Get a Free Quote